MiBoxer FUT081ZR LED Downlight 18W RGB-WW(RGB-CCT) adjust ZigBee 3.0 und 2,4 GHz

45,99 €

Enthält 19% MwSt. DE
zzgl. Versand
Lieferzeit: ca. 1-5 Werktage
GTIN: 4038816246813

18 vorrätig

Artikelnummer: AN-246812 Kategorie: Marke:

Beschreibung

FUT081ZR 18W Deep Anti-glare LED RGB+CCT Downlight (Zigbee 3.0+2.4G) • High CRI COB LED Chip • 2.4G RF remote controllable • Color temperature and brightness adjustable • Control distance: 30m Features It’s deep anti-glare downlight with 2.4G wireless transmission technology, dim brightness or RGB+CCT to create different lighting scene and improve lighting experience. Parameters Zigbee 3.0 standard protocol Deep plastic enclosure with best anti-glare performance,UGR=19 Dimmable RGB and CCT ( 2700-6500K) 2.4G wireless transmission technology smooth dimming with 4096 level, mini brightness 0.1% Auto-forwarding: Automatically forward the remote control signal to another master box, making the remote control distance infinite Auto-synchronization: The same dynamic pattern is automatically synchronized to keep the pattern consistent Have DND function, usually used in power failure area and save power Support TUYA SMART app control (2.4G gateway is needed) Support third party voice control like Alexa, Google assistant,Yandex Alice (2.4G gateway is needed) Product Name: Deep anti-glare LED RGB+CCT downlight Model No.: FUT081ZR Input Voltage: AC100~240V 50/60Hz Power: 18W PF: &gt0.5 CRI: &gt90 Color temperature: 2700~6500K Luminous Flux: 1060LM Luminous efficiency: 60LM/W Beam Angle: 24° RF: 2.4GHz RF Control Distance: Zigbee: 50M(open area)/ 2.4G RF: 30M IP rate: IP20 Working Temperature: -10~40°C Hole Size: 95mm Dimming Grayscale: 4096 Levels Dimming Range: 0.1%-100% Dimming Curve: Logarithmic EMC Standard (EMC): ETSI EN301 489-1 v 2.2.3 (2019-11) ETSI EN 301 489-3 v 2.3.2 (2023-01) Safety Standard (LVD): EN IEC 60598-1:2021+A11:2022 EN 60598-2-2:2012 EN IEC 62031:2020+A11:2021 EN 62493:2015+A1:2022 Radio Equipment (RED): ETSI EN 300 440 V2.2.1 Certification: CE, EMC, LVD, RED

Zusätzliche Informationen

Gewicht 0,68 kg
Maße 144 × 125 × 130 cm
Hersteller-Nr.

FUT081ZR