MiBoxer FUT075 LED Downlight 9W dualwhite (CCT) adjust 2,4 GHz HF

26,49 €

Enthält 19% MwSt. DE
zzgl. Versand
Lieferzeit: ca. 1-5 Werktage
GTIN: 4038816141064

55 vorrätig

Artikelnummer: AN-235881 Kategorie: Marke:

Beschreibung

9W Deep Anti-glare LED CCT Downlight (2.4GHz) • High CRI COB LED Chip • 2.4G RF remote controllable • Color temperature and brightness adjustable • Contrl distance: 30m • The angle of the lamp body can be rotated Product Name: 9W deep anti-glare LED CCT downlight Model No.: FUT075 Input Voltage: AC100~240V 50/60Hz Power: 9W PF: &gt0.5 CRI: &gt90 Color temperature: 2700~6500K Luminous Flux: 700LM Luminous efficiency: 78LM/W Beam Angle: 24° RF: 2.4GHz RF Control Distance: 30m IP rate: IP20 Working Temperature: -10~40? Hole Size: 75mm Dimming Grayscale: 4096 Levels Dimming Range: 0.1%-100% Dimming Curve: Logarithmic EMC Standard (EMC): ETSI EN301 489-1 v 2.2.3 (2019-11) ETSI EN 301 489-3 v 2.3.2 (2023-01) Safety Standard (LVD): EN IEC 60598-1:2021+A11:2022 EN 60598-2-2:2012 EN IEC 62031:2020+A11:2021 EN 62493:2015+A1:2022 Radio Equipment (RED): ETSI EN 300 440 V2.2.1 Certification: CE, EMC, LVD, RED

Zusätzliche Informationen

Gewicht 0,372 kg
Maße 125 × 115 × 90 cm
Hersteller-Nr.

FUT075